Communication Equipment Room
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Guangdong
- Validity to:
Long-term effective
- Last update:
2017-08-21 00:55
- Browse the number:
214
- Puyuan Hongye Technology Co.,Ltd
-
Contact:
szpuyuan(Mr.)
-
Email:

-
Telephone:

-
Phone:

-
Area:
Guangdong
-
Address:
3-1 Building,Xinzhongtai Culture Pioneer Park, No.1 Caiyun Road,Longgang District,Shenzhen,China.
- Website: http://www.pyhousing.com/ http://szpuyuan.qishifu1688.com/
By certification [File Integrity]
Product details
Puyuan Hongye Technology Co.,Ltd is one of the leading communication equipment room manufacturers and suppliers in China, equipped with a famous factory, welcome to wholesale our cheap, customized prefab and prefabricated communication equipment room at low price.
| Main structure Specification(Standard) | ||
| L*W*H | 10GP 2991*2438*2591mm, can customized | |
| Container Body | 1. Container equipment rooms(thick steel) | |
| 2. Colored steel room(sandwich plate:50mm thick steel+color polystyrene--foam) Options:75mm/100mm thick steel+polyurethane(PU) | ||
| Other components | ||
| External Wall | Carved metal board/placstic wood board, optional colors | |
| Shutter | Aluminum alloy waterproof shutter window | |
| Coating | High corrosion resistant coatingk for color steel plate and steel columns |
|
| Column and beam | Columns and beams are welded square tubes | |
| Features | ||
| ● Bearing Capacity:floor bearing≥600kg/㎡, roof bearing≥400kg/㎡; | ||
| ●Sealing performance: Perfect joint tightness and water tightness, k can reduce the thermal (cold) loss and prevent entering dust. Sealk material between the door and door frame, make sure the doork has a good sealing performance; | ||
| ● Compact space design, small volume, easy for installation k in complex environment; | ||
| ● Top safe lifting, firm structure; reusable, low relocation costs,k solve problems of setting communication points at unstable region; | ||
| ● Room chassis & frames are steel welded and bolt connected, k durable and ensures overall reliability. | ||
| ● Main cabinet, power cabinet is located at a fixed point on k corresponding steel beam, the steel beam has nut pre-welded to k ensure the equipment will not be deformed,damaged and work properly k in the transport loading, seismic and wind loads. | ||
| ●Anti-leakage, corrosion resistance, anti-aging, anti-UV, k shock, dust, radiation, noise, heat insulation, fire-retardant; | ||
| ● Integrated power inlet box, cable rack, patch panels, k grounding device, temperature control system, these perfect facilitiesk make installation simple; | ||
| ● Security design with high anti-damage rate; | ||
| ● Can do maintenance in the cabinet, install the k distribution box (with SPD), 19-inch chassis(install master equipmentk , etc.), integrated air conditioner and other equipments under k requirement ; Can add monitoring alarm systems (access control, k power supply failure, smoke, flooding, temperature and humidity) | ||
| Protection level | ||
| ● Up IP65 | ||
| Durablity | ||
| 15-25 Years(Working in normal enviroment) | ||
-
Single-phase 5A Thyristor Regulator
price: Negotiable
-
Single-phase 50A Dual-communication SCR Controller
price: Negotiable
-
Three-phase Two-wire Thyristor Power Regulator
price: Negotiable
-
Three-phase Thyristor Voltage Regulator
price: Negotiable
-
Single-phase Thyristor Current Regulator
price: Negotiable
-
Corrugated Plastic 4 X 8 Sheets
price: Negotiable











